Guangzhou Baiyun Airport dry-type transformer using Innotek thermostat
Date: June 16, 2025 15:35:41
InnotekDry-type transformer thermostatUtilizing the three platinum RTDs embedded in the three-phase windings of the dry-type transformer to detect and display the temperature rise of the transformer windings, which can be automatically started and stopped.
Cooling FansForced air-cooling of the windings, to avoid or reduce the transformer due to overheating and damage to the insulation material, to extend the service life of the transformer, the appearance of the design is beautiful and generous, the display is clear, the operation is simple and flexible, the anti-interference ability is strong, the work is stable and reliable, and can be adapted to a variety of harsh environments under the operation.
Innotek Thermostat Function It has three-phase circuit display / maximum display, fan automatic / manual start and stop, over-temperature alarm, over-temperature trip, fault alarm, "black box" function, fan timing incentive function, analog test function, digital compensation function, etc., and according to user needs to increase the cabinet door open alarm function, 4 ~ 20mA analog current output, RS485/232 serial communication function, machine room ambient temperature measurement and control, cooling fan fault detection and alarm, PTC150 over-temperature trip interlock control.
Fuzhou Innotek Electronic Technology Co., Ltd. provides dry-type transformer thermostats for Guangzhou Baiyun Airport, and the equipment has been operating stably and reliably since it has been put into operation, which guarantees the normal operation of the airport's power system, and the two sides have maintained a long-term cooperative relationship.
